ECONOMY

Agriculture | Industry | Power



NEW POWER DEVELOPMENT PROJECTS

The most noteworthy projects:

THEIN DAM PROJECT

Thein Dam Project, envisages the construction of a dam and power plant on river Ravi, 24 kilometers upstream of Madhopur head works. The power plant comprises four units of 120 MW.

SHANAN EXTENSION PROJECT

The Shanan extension project was completed in 1982 and its unit of 50 MW has been commissioned. Regarding the strengthening of hill slopes, necessary action was initiated and the work of providing horizontal drainage holes to release saturated water pressure and anchoring the hill slopes was taken up during 1983-84.

SHAHPURKANDI BARRAGE  AND POWER PLANT SCHEME

This scheme envisages the constitution of high-level barrage and a power plant across the Ravi river near Shahpurkandi, about 8kms upstream of the existing Madhopur head works. The power plant consist of two units of 47 MW each.

SUTLEJ-YAMUNA LINK PROJECT (SYL)

The SYL project envisages generation of 44 MW of Power at two power houses. Two units of 12 MW each installed at PH-I and two units of 10 MW each at PH-II. The power house-I is located near Ropar and power house-II near Rajpura.

ANANDPUR SAHIB HYDEL PROJECT

This project envisages generation of 134 MW of Power at two power houses, each housing two units of 33.5MW. These power houses are located near Ganguwal and Nakkian on the Anandpur Sahib Hydel Channel which is about 35 Km long and runs almost parallel to the existing Nangal Hydel Channel.

MUKERIAN HYDEL PROJECT

This project envisages the construction of a 36 Km long hydel channel of 11,500 uses capacity, taking-off at River Beas down-stream of Pong Dam at Shah Nahar Barrage near Talwara township. This channel  will end into River Beas near village Churian.

Four more powerhouses are constructed on hydel channel at the following locations.

Powerhouse I at RD: 6.350 Km-Three machines f 15 MW each

Powerhouse II at RD: 16.004 Km-Three machines of 15 MW each.

Powerhouse III at RD: 18.879 Km-Three machines of 1.95 MW each.

Powerhouse IV at RD: 25.930 Km-Three machines of 15 MW each.

[Back]


 


Quick Links - Webindia123.com
Services
Hobbies
 
Entertainment
Classifieds
Career / Education
UK, USA, Canada
Utilities
E-Booking
India Reference
 
 
 
 
 
 
 
 
 
IndianStates
 
 
 
 
  
 
 
 
 
Pradesh

Copyright 2000- Suni Systems (P) Ltd.
All rights reserved